Kings Cross Development

In sales you are always looking forward, occasionally you do get time to look back and having done this recently we felt that the prestigious Argent development at Kings Cross was worth highlighting. From 2013 to date we have supplied over £5.6 Million of switchgear.

Having recently completed the installation of two 2.5 MVA Transformer s and the Low Voltage Switchboards on 11 - 21 Canal Reach (T Zone) for Bam Construction through Bam Services Engineering.


It was with Bam we had supplied the Package Substation and Low Voltage Switchboards on the B6

(3 Pancras Square) and B5 (4 Pancras Square).


Paul Rabbitts - Building Services Project Manager

(Services Engineering - Bam Construction)


“GRE have provided an excellent service covering their full scope of LV distribution from engineering, manufacture, delivery to agreed programme along with testing, commissioning, and aftercare on several buildings at Kings Cross for BAM and continue to do so with the buildings we are still developing here.


With the completion of the recent P2 project also for Argent with Kier with whom we had previously supplied the Low Voltage Switchboards on Building R7 and Building B3 adding to our portfolio.


We supplied a containerised solution on S1 Building with Briggs and Forrester followed by the containerised Package Substation to the S2 Building, with SES, on both projects Hilson Moran were the Building Services Consultants.

(Tony Mayo Project/Technical Director)



Having supplied standalone HV Switchgear, cast resin transformers in housings, roof mounted containerised Package Substations, Generator Panels, Life Safety Panels, Low Voltage Switchboards, Automatic Transfer Switches on this prestigious development.


If you require further information on any of these projects or how we can provide assistance in design, space planning or a quotation on your next project contact us at sales@gr-electrical.co.uk