Case Studies - Virgin Northampton
Client: J A Richardson Limited
Value: £193k
Description: Refurbishment of existing switchboards. Installation of New Switchboards to increase reliability and resilience of supplies.
100KA System for Virgin Media. 2 Transformer Incomers, 3 Generators Fully Synchronous system with PLC Interface for further control operations suited to Virgin Media Requirements.
Manufacture and Install:
Additional switchboards, Replacement Sections and Replacement Changeover Controls.
Technical Specifications
-
1600A Switchboards
-
Duel Generators - Duel Mains Supplies N+2 redundancy to critical equipment
-
Timed load reinstatement to prevent Generator Overload
-
Auto Changeover of Air Conditioning supplies with dynamic decays for
-
stepped reinstatement
-
Separate Small Power & Lighting with Auto Changeover Switchboard