top of page
Case Studies - Virgin Northampton 

Client:                      J A Richardson Limited

Value:                      £193k

Description:            Refurbishment of existing switchboards. Installation of New Switchboards to increase                                            reliability and resilience of supplies.

 

100KA System for Virgin Media. 2 Transformer Incomers, 3 Generators Fully Synchronous system with PLC Interface for further control operations suited to Virgin Media Requirements.

 

Manufacture and Install:

Additional switchboards, Replacement Sections and Replacement Changeover Controls.

 

Technical Specifications

  • 1600A Switchboards

  • Duel Generators - Duel Mains Supplies N+2 redundancy to critical equipment

  • Timed load reinstatement to prevent Generator Overload

  • Auto Changeover of Air Conditioning supplies with dynamic decays for

  • stepped reinstatement

  • Separate Small Power & Lighting with Auto Changeover Switchboard

IMG_20180821_115544.jpg
IMG_20180821_115505.jpg
IMG_20180821_115413.jpg
bottom of page