Case Studies - Northern Batch Hospitals Hope and Tameside Hospital, Salford

Client: Balfour Beatty Engineering Services Ltd
Consultant: Hulley and Kirkwood
Value: £1.2 million
Manufacture and Install:
LV Switchgear, Section Boards and Sub Distribution

Technical Specifications

  • GR60R & Sherburn Front & Rear ASTA Certified Switchboards 50kA for 3 Seconds
  • Form 4 Type 6 & 5
  • Double Ended Package Substation (N&I System)
  • Double Generator Incomers/ with Mains & Generator Synchronising
  • Fuse Rated Busbar Trunking
  • Relay logic specified Control System
  • Integral detuned Power Factor Correction
  • Full Discrimination/Coordination Survey from HV to Final Distribution
  • 3D Inventor designed switchboards – Active Manufacturing modelling
  • A joint venture with BBESL/Hulley & Kirkwood/Thistle to actively develop a fully integrated Mains/Generator/Bus Control Philosophy
 

NHS logo

GR Electrical Services Limited, Merlin House, Aviation Road, Sherburn Enterprise Park, Sherburn in Elmet, Leeds LS25 6NB Telephone 01977 681681 © All content copyright GR Electrical Limited 2010 Website by Refractiv